CONNECTED magazine n°12
?
學習與探索

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

LEMO launches a 1000 Base T1- Single Pair Ethernet (SPE) Push-Pull connector
Based on transmission standards (IEEE 802.3), single-pair Ethernet (also called SPE or 1000Base-T1) is integrated into new generations of automobiles. 1000Base-T1 is designed to operate over a single twisted-pair copper cable supporting an effective data rate of 1 Gbit/sec in each direction simultaneously.

Opening of LEMO Latin America
The LEMO group is proud to announce the creation of LEMO Latin America. The sales office is located in the city of Campinas in the state of S?o Paulo - Brazil.