CONNECTED magazine n°12
?
學習與探索

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

1969 - A giant leap for LEMO
50 years ago, Neil Armstrong wasn’t the only one taking some important steps. In early December of that year, LEMO first set foot in Germany and this new subsidiary was to become one of the largest in the Group.

New S series design
LEMO launches a new design for the S series connector range. The S series connector is one of the initial designs of the LEMO Push-Pull system. This product range will now also include a new outershell design using LEMO's famous chocolate bar shape.