CONNECTED magazine n°17

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

Integrated Electronics
Medical device design engineers and military equipment designers face similar challenges: a need to save valuable PC board space. One popular solution is to integrate electronics into a connector. An example of connector manufacturers doing this for many years is a connector integrating noise filtering and EMP (Electromagnetic Pulse) suppression components into the rear shell of circular or d-sub

New Factory in Budapest Hungary
To increase LEMO's production capacities, a new factory has been built in Budapest-Hungary. The new factory has been running since November 2010 and has a total surface of 10'240 m2. It is the only LEMO Group factory that combines all the manufacturing processes within one site : injection molding, assembly and plating....