CONNECTED magazine n°17
?
學(xué)習(xí)與探索

Cable assemblies & connectivity solutions brochure
Cable assemblies & connectivity solutions brochure highlights LEMO's capability to solve customer enquiries regarding cable assembly and overmolding. The 12 page document is in english with emphasis on quality, certifications, all in-house capabilities from customer enquiry to delivery of small to large production volumes.

LEMO magazine CONNECTED n°15
The 15th issue of LEMO's CONNECTED magazine is out!Visit at the Swiss time factoryPhonak's secret conversationsThe race to crush the sailing speed record

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.