CONNECTED magazine n°2

學習與探索
    redel st croix
    News

    A new REDEL production site is inaugurated!

    The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

    halo led connector
    News

    Halo LED connector

    This product includes a LED lit flange allowing to display the connection status, which enables the user to have immediate visual identification showing that the connector is securely connected and powered up.

    t series lemo connector
    News

    New T series design

    LEMO enhances the T series range with a new design, the connector plug and free socket now include the LEMO "chocolate design" pattern, already on LEMO’s traditional products, B and K series. This new design is completely compatible with previous designs. The TT, 0T and 1T series will be available with 3 latches. Caps are to be updated to reflect the chocolate plate as well.

    lemo canada building
    News

    LEMO Canada is Moving to a New Location

    LEMO Canada is happy to announce that we have moved into new business premises since September 20, 2013. The new location is ideally located in Richmond Hill, Ontario.