CONNECTED magazine n°2

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

1969 - A giant leap for LEMO
50 years ago, Neil Armstrong wasn’t the only one taking some important steps. In early December of that year, LEMO first set foot in Germany and this new subsidiary was to become one of the largest in the Group.

Cutting-edge technology for better water quality
At a time when new technologies keep emerging and replacing each other, LEMO provides a rare, even unique, service.

The robot with a human touch
Walkman mimics human movements in a strikingly accurate way. Its designers have developed it in record time and predict a great future for it.

Fitted for fever pitch broadcast
The Euro 2016 football final took place in Stade de France on 10th July. Thanks to the high technology cable network installed by Synoptic Broadcast.