CONNECTED magazine n°5
?
學(xué)習(xí)與探索

CONNECTED N°19 IS OUT!
Discover Disney’s ? The Lion King ?, underwater wireless networks, the Paris Opera House and much more!

LEMO magazine CONNECTED n°15
The 15th issue of LEMO's CONNECTED magazine is out!Visit at the Swiss time factoryPhonak's secret conversationsThe race to crush the sailing speed record

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.