CONNECTED magazine n°8

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

1969 - A giant leap for LEMO
50 years ago, Neil Armstrong wasn’t the only one taking some important steps. In early December of that year, LEMO first set foot in Germany and this new subsidiary was to become one of the largest in the Group.

Integrated Electronics
Medical device design engineers and military equipment designers face similar challenges: a need to save valuable PC board space. One popular solution is to integrate electronics into a connector. An example of connector manufacturers doing this for many years is a connector integrating noise filtering and EMP (Electromagnetic Pulse) suppression components into the rear shell of circular or d-sub