CONNECTED magazine n°9

LEMO magazine CONNECTED n°15
The 15th issue of LEMO's CONNECTED magazine is out!Visit at the Swiss time factoryPhonak's secret conversationsThe race to crush the sailing speed record

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

LEMO adds 3D models to PartCommunity 3D model download portal
Since beginning of march 2019 LEMO has added 3D drawings on the Cadenas platform, an online library for 2D and 3D models also called PartCommunity. LEMO's 3D models will now be available for free download also from PartCommunity, allowing our customers to download their 3D drawings from multiple sources. The models are organised by product categories & product series.