新聞

查看以下最新雷莫新聞。在這里,您將找到來自我們?nèi)蚣瘓F(tuán)以及與您息息相關(guān)的本地新聞的基本信息。您將了解到我們最新創(chuàng)新的詳情,產(chǎn)品更新以及我們最近獲得的獎項信息。

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

LEMO magazine CONNECTED n°14
The 14th issue of LEMO's CONNECTED magazine is out!Connectors to combat the virusThe urge to breatheAt the heart of the Dakar rally

LEMO’s new HARPOON: Press fit contacts for elbow and straight PCB sockets
LEMO connector is well known for its Push-Pull connector. LEMO’s new harpoon earthing pins enable pre-installing easily various receptacles/socket.The advantage of these new press-fit contacts is the gain of time while doing the pre-assembly, no need to place the washers and screw 4 times the M1.6 screws.Simply align the connector and push firmly. This pre-assembly will enable the assembly house o